HighDeck System


SAFE. EFFICIENT. FLEXIBLE.

The HighDeck panel has an innovative design which allows you to build a party wall scaffold through the deck due to the position of the holes. Once the internal scaffold has been removed, there is no need to have a void in the safety decking platform, improving the build process by reducing labour time and revisits to site.


The system provided by HighDeck is easy to handle, with three main components, which makes it quick and simple to erect and dismantle. We supply and install the full system for you, so you have one less thing to worry about. We operate in a wide range of areas, and cater for both house building and civil construction backgrounds. A large stock ensures that we are able to meet your demands and needs.

HighDeck System Specification

  • Safe working loading of 2.0kN per m²
  • Dual locking pin safety feature which can be viewed from above to show the system is locked correctly
  • Quality Fall Prevention Working Platform
  • Available in 3 different size panels: 1m x 1m, 1m x 750mm & 1m x 500mm
  • Easy to handle, erect and dismantle. Our operatives can comfortably erect 60 m² per hour.
  • Reduces risk and improves productivity
  • Complies with working at height regulations
  • Profiled non-slip surface and high visibility.

Get a Quote

Interested in finding out how the HighDeck Safety System can streamline your construction process? Get in touch with on the form below.

Copyright © 2024 HighDeck Safety Systems | All Rights Reserved.